Best Practice In Surface Production Operations Management

Oil and Gas Production in the form of accurate measurement and back-allocating volumes to the wells, efficient production deferment tracking, and enhanced integrated production planning process pose a challenge to proper management of an oilfield asset.

 

In the oilfield, it is a routine practice to carry out these activities (consciously or otherwise) without recognizing and adhering to best practices. The case study indicates that inaccurate measurements of crude oil & gas production represent about 10% revenue loss to an asset with attendant legal consequences or confidence impact in some instances.

 

This naturally cascades into unreliable business planning cycles and field reserve estimation. This Best Practice in Surface Production Operations Management training will go steps further to highlight current best industry practices with field experience including challenges and how to mitigate identified challenges. This training seminar will further show how an integrated production operations approach is applied in addressing these challenges including custody transfer and other terminal nodes.

 

  • Understand the challenges associated with production operations management
  • Highlight best practice in metering, deferment administration, and planning
  • Generate strategy to meet the business-driver in an asset using a case study
  • Provide appropriate improvement process

 

  • Production Operators
  • Field Production Personnel / Supervisors / Superintendents
  • Production Engineers
  • Asset Managers and Senior Managers
  • Asset Support Engineers
  • Process Engineers
  • Reservoir Engineers
  • Planning Engineers
  • Production Accountants / Engineers

 

  • Introduction to Surface Production Operations
  • Tools Supporting Operations Management
  • Overview of Well, Reservoir & Facility Management (WRFM) process
  • Metering Systems
  • Operations Integration

 

  • General Principles of Deferment Administration
  • Measurements
  • Deferment Coding
  • Roles & Responsibilities
  • HCA Applications

 

  • Principles of Production Allocation & Reconciliation
  • Domain Experts & Required Technology
  • Populating and Verification / Validating Process of Data
  • Allocation & Reconciliation
  • Standard HCA Business Workflow

 

  • General Principles of Activity Planning
  • Overview of Water-Injection System
  • Business Objective for Integrated Production Planning
  • Common Tools Required
  • Challenges in Integrated Production Plan
  • Integrated Production Plan Workflow
  • Strategy in Generating Robust Plan linke

  • Case Study
  • General Course Review
  • Assessment of Participants
  • Feedback
  • Closing Remarks

 

Related Courses